Work Continues in Euclid Ohio

Work continues in Euclid, Ohio as the metal package prepares to be installed at the future Extra Space Storage. The new RTUs have been installed on the freshly completed roof. The ductwork is near completion as the painting scope nears the end. The floor grinding will make way for the metal package installation as work to the office makes headway.